-
Empennage · Elevator — Work Session (24h 18m)
Bent trim tabs to required width and bent the end tabs. final drilled all holes, bent bottom skin 15 degrees. Trimmed tab arms
-
Empennage · Elevator — Work Session (47h 13m)
Rolled leading edges of elevators and installed rivets.
-
Empennage · Elevator — Work Session (3h 7m)
riveted trail edge od both elevators and middle close out tabs with cs-4-4
-
Empennage · Elevator — Work Session (1h 39m)
Glued in foam ribs and trailing edge wedge with tank sealant
-
Empennage · Elevator — Work Session (51h 43m)
-
Empennage — Work Session (4h 2m)
finished front spar riveting on both elevators. Closed inner end skins and riveted the inner rib to the spars.
-
Empennage · Elevator — Work Session (171h 10m)
Finished riveting the ribs together and added front spar to the elevators. Started top row of front spar riveting
-
Empennage · Elevator — Work Session (1h 23m)
finished left and right rear spar, next step is to join the other half
-
Empennage · Elevator — Work Session (30h 12m)
Riveted all the elevator spars on and the trim support bracket
-
Empennage · Elevator — Work Session (25h 18m)
Assembled the end ribs/counter weight mounts.
-
Empennage · Elevator — Work Session (2h 35m)
made elevator foam ribs and trim tab foam ribs
-
Empennage · Elevator — Work Session (1h 34m)
Bent trailing edges
-
Empennage · Elevator — Work Session (5h 25m)
Counter Sinking aft spar 29 holes on top, counter sinking tailing edge insert
-
Empennage · Elevator — Work Session (21h 55m)
Dimpled all skins and counter balance skins, Dimpled all parts and cleaned edges of skins
-
Empennage · Elevator — Work Session (58m)
Skin debur
-
Empennage · Elevator — Work Session (7h 1m)
Finished deburring all holes and edges on elevators minus trim tabs
-
Empennage · Elevator — Work Session (1h 47m)
Deburred parts
-
Empennage — Work Session (3h 19m)
Final drilled all bottom bulkhead skin holes to #40. Cleco 1040 in prep for drilling. Skipping the rest of 10-12 since the show planes comp top will be used.
-
Empennage · Tailcone — Work Session (24h 36m)
Finished all the 1032 longeron match drilling
-
Empennage · Tailcone — Work Session (1h 16m)
Match drilled F-1032 longerons and side skins
-
Empennage · Tailcone — Work Session (1h 26m)
Fabricated F-1011D & F-1012D NOTE SB 18-03-30 part fabricated to replace stock F-1012D
-
Empennage · Tailcone — Work Session (3h 24m)
Finished the J stiffener extension, added the the front bulkhead 1006 and 1028. Final drilled mount holes Finished the bell crank assemble L brackets and final drilled/ counter sunk for nutplates.
-
Empennage · Tailcone — Work Session (4h 4m)
More J Stiffener match drilling, finished all J stiffeners and added the extension.
-
Empennage · Tailcone — Work Session (4h 28m)
match drilled bottom and right side J stiffeners
-
Empennage · Tailcone — Work Session (25h 1m)
Worked on J stiffeners, adding centerline and repair C due to the short cut
-
Empennage · Elevator — Work Session (49h 36m)
Debur of various parts of the elevators
-
Empennage · Tailcone — Work Session (7h 27m)
cut J stiffeners, assembles all bulkheads and started assembling the tailcone
-
Empennage · EMP Fairings — Work Session (3h 13m)
-
Empennage · EMP Fairings — Work Session (2h 32m)
made rudder cable guides and frame stiffener, also straightened and finished the tie down lollipop end brackets for tie downs. Finished the horizontal attachment bars, final drilled and attached all t…
-
Empennage · Elevator — Work Session (5h 27m)
Final hole drill of all skin holes with a #40 drill. Added nut plates to trim tab frame and dimpled hatch
-
Empennage · Elevator — Work Session (26h 51m)
More assembly and match drilling, cut the trailing edge angle.
-
Empennage · Elevator — Work Session (1h 59m)
Added trim cable support brackets and corner support, then upsized corner support to #30 holes
-
Empennage · Elevator — Work Session (4h 24m)
-
Empennage · Elevator — Work Session (1h 20m)
Final drilled common holes on the ribs and started assembly of tip caps
-
Empennage · Elevator — Work Session (2h 2m)
Cut ribs apart, cut separated sheer clips and started debur of all parts
-
Empennage · Horizontal Stabilizer — Work Session (3h 22m)
finished all the skin rivets on the front spar, nose ribs, mid ribs and center assembly. Attached rear spar and added all rivets to complete this chapter.
-
Empennage · Horizontal Stabilizer — Work Session (2h 53m)
-
Empennage · Horizontal Stabilizer — Work Session (57h 24m)
installed the front spar into skins and attached to nose ribs to the forward spar with blind rivets per plans. Inner ribs rivets installed. Added two outer ribs and all skin rivets per manual.
-
Empennage · Horizontal Stabilizer — Work Session (2h 26m)
Put skins in craddle, cleco nose rids to skins, used 426 3-3.5 rivets to attach the nose ribs.
-
Empennage · Horizontal Stabilizer — Work Session (4h 40m)
Assembled the stringer and stringer web assembly. Installed rivets, 8 4-4s and 36 4-5s