Empennage · Tailcone — Work Session (3h 24m)
Empennage · Work package 10 Tailcone · 3h 24m · Plans: Page 10-8, 10-9, 10-10, Section 10, Step 1-7, 1-5, 1-2
Finished the J stiffener extension, added the the front bulkhead 1006 and 1028. Final drilled mount holes
Finished the bell crank assemble L brackets and final drilled/ counter sunk for nutplates.
← All entries in this build log