Empennage · Horizontal Stabilizer — Work Session (57h 24m)
Empennage · Work package 8 Horizontal Stabilizer · 57h 24m · Plans: Page 8-12, Section 8, Step Step
installed the front spar into skins and attached to nose ribs to the forward spar with blind rivets per plans. Inner ribs rivets installed. Added two outer ribs and all skin rivets per manual.
← All entries in this build log