Empennage · EMP Fairings — Work Session (2h 32m)
Empennage · Work package 12 EMP Fairings · 2h 32m · Plans: Page 10-2 & 10-3, Section 12, Step 1-6 & 1-3
made rudder cable guides and frame stiffener, also straightened and finished the tie down lollipop end brackets for tie downs. Finished the horizontal attachment bars, final drilled and attached all three to the bulkhead
← All entries in this build log