Empennage — Work Session (3h 19m)
Empennage · 3h 19m · Plans: Page 10-11, Step 5
Final drilled all bottom bulkhead skin holes to #40. Cleco 1040 in prep for drilling. Skipping the rest of 10-12 since the show planes comp top will be used.
← All entries in this build log