Empennage — Work Session (4h 49m) 2026-09-27 Empennage · 4h 49m · Plans: Page 9-18, Step 5,6,7,8,9,10Riveted the bottom of the front spar of trim tabs, glued in six foam ribs and riveted the end tabs. ← All entries in this build log